500th GyroTrack survey performed!
July 13, 2023 by admin
Filed under Prime Blog
We are very proud to announce that Prime Horizontal’s expert team of GyroTrack survey engineers has reached the golden number of 500 #GyroTrack surveys.
This is a lot of pipelines, 130,900m to be precise, an average of 262m per survey. Our longest was 1360m and the most bends in one survey was 11 bends including two HDDs, all in one pipe. We have worked on every continent, in every weather condition surveying every kind of conceivable pipeline.
We look forward to the next ten years with the knowledge that our team of highly experienced engineers are ready to face all new upcoming Pipeline Mapping challenges.
No-Dig Brazil 2023
July 5, 2023 by admin
Filed under Prime Blog
No-Dig Brazil 2023 in Sao Paulo (July 4th to 6th)
?? Prime Horizontal will be present at the No-Dig Brazil 2023 in Sao Paulo (July 4th to 6th), through our Romtec distributors: Marcos Guerrero & Rodrigo Guerrero. Visit us to learn more about #HDD #Navigation #ParaTrackSystem #GyroModule #Intersects and the great projects we have done in #Brazil and #LatinAmerica.
• The visit is free and registration will take place at the entrance of the event. • To participate in the congress or for more information access the link: https://lnkd.in/dm2i586k
?? Prime Horizontal estará presente na No-Dig Brasil 2023 em São Paulo (4 a 6 de Julho), através dos nossos distribuidores da Romtec: Marcos Guerrero & Rodrigo Guerrero. Visita-nos para saber mais sobre #HDD #Navegação #ParatrackSystem #GyroModule #Interseção e os grandes projetos que temos feito pelo #Brasil e #AmericaLatina.
?? Prime Horizontal vá a participar en el evento No-Dig Brasil 2023 en São Paulo (4 a 6 de Julio), através de nuestros representantes de Romtec: Marcos Guerrero & Rodrigo Guerrero. Visítanos para saber más de #NavegaciónPHD #ParatrackSysten #GyroModule #IntersecciónPHD y los grandes proyectos que hemos hecho en #Brasil y #Latinoamerica.
Throwback Thursday: 2.6 km Indian HDD Intersect
June 15, 2023 by admin
Filed under Prime Blog
Intersection with #ParaTrack2 Technology
Bhareli River Intersect
Tracking used: ParaTrack2
Location: Tezpur, Assam, India
Distance: 2630 m
Depth: -10.34 m
Entry Angle: 8 degree
Exit Angle: 8 degree
Ground: Sand with Clay.
Pipeline: 26” steel pipe
Technique: #Jetting assembly 6 ¾” – 9 7/8
Job Description: NRL is laying this pipeline in Northeast region of India. This pipeline will be used for oil distribution in Northeast India. It connects the Northeast to rest of India. HDD method is utilized to cross the Bhareli River to connect both ends of pipeline of this project. This project is a part of Paradip NRL Expansion project of Numaligarh Refinery Limited
NRP Patel completed another Intersection in Assam, India proving to be one of the most respected HDD companies in India.
Jupiter Cable System
June 6, 2023 by admin
Filed under Prime Blog
Daet, Philippines- Jupiter Cable Syetem
Tracking used: #ParaTrack#GyroModule and #ACBeacon
Distance: 1,206 m
Depth: 31.56 m
Entry Angle: 17 degree
Exit Angle: 8 degree
Ground: Sand
Pipeline: Drill pipe 5”
Technique: #Jetting – Drill to sea
Throwback Thursday: 3.5km Intersect in India
May 25, 2023 by admin
Filed under Prime Blog
Subansiri River HDD Intersect
https://youtu.be/0clhijS1GIQ
https://www.youtube.com/shorts/lkD-jpyNUNE
Tracking used: ParaTrack-2
Location: Assam, India
Distance: 3512 m (11522 ft)
Depth: -30 m (98 ft)
Entry Angle: 12 degree
Exit Angle: 10 degree
Ground: Sand with Clay.
Pipeline: 6” + 24” steel pipe
Technique: Jetting assembly/ Intersect Technology
Job Description: Indradhanush Gas Grid Limited (JV of IOCL, ONGC, GAIL, OIL and NRL) is laying this pipeline in Northeast region of India. This pipeline will be used for gas distribution in Northeast. It connects the Gas pipeline from Assam in the Northeast to the rest of India. HDD method is utilized to cross the Subansiri River to connect both ends of pipeline of this project.
#trenchless #leadership #trenchlesstechnology #oilandgas #directionaldrilling
Rio Sai Mirim Crossing
May 23, 2023 by admin
Filed under Prime Blog
HDD rock crossing
https://youtube.com/shorts/KuL46MFmZ6U?feature=share
Execution: Brasfix
Length: 513.75m
Entry/Exit angle: 10 degrees
Minimum radius: 608m
Operating time: 7 days.
Romtec HDD Tools – Drill 9-7/8 IADC 637
Prime Horizontal Mud Motor, ParaTrack-2 guidance system and navigation service.
#primehorizontal #Innovation & #experience #teamworkmakesthedreamwork
#HorizontalDirectionalDrilling
Warmingsgade HDD Crossings
May 22, 2023 by admin
Filed under Prime Blog
Kudos Prime Horizontal Europe
Tracking used:
HDD-1 (right): Surface Coil and #ParaTrack #GyroModule
HHD-2 (middle) & HDD-3 (left): Underground Coil
Location: Kolding, Denmark
Distance: 198.77m (HDD-1), 198.14m (HDD-2) and 200.55m (HDD-3)
Depth: 9m
Horizontal Curve: 17deg (HDD-1), 14deg (HDD-2) and 9deg (HDD-3)
Entry Angle: Between 14 and 15 deg
Exit Angle: Between 14 and 15 deg
Ground: Sand, Clay, and Gravel
Pipeline: 355mm HDPE (HDD-1 and HDD-3), 280mm HDPE (HDD-2)
Technique: 4 ¾” Prime Horizontal #Jetting Assembly
The job called for the execution of 3 parallel #HDD’s to cross railway tracks below an existing underground passage for pedestrians and cyclists. As seen in the photo of the tunnel to install electrical wires.
Offshore approach for LPG in Brazil
April 17, 2023 by admin
Filed under Prime Blog
TGS Terminal Gas Sul. Itapoá – Baía de Babitonga. Gasoducto 20”
Tracking used: ParaTrack #GyroModule & #SurfaceCoil (ParaTrack 2)
Location: Itapoá, Santa Catarina, #Brazil
Distance: 1780 m
Depth: 35 m
Horizontal Curve: 29deg left curve
Entry Angle: 11deg
Exit Angle: 5deg
Ground: Mostly sand all the way.
Pipeline: 20” steel pipe
Technique: Jetting assembly. 10” jetting shoe
#Offshore approach to connect a new pipe line to a platform in the Babitonga Bay where gas from tank ships will be liquified into LPG
There were 60m of 36” casing at the beginning, then a surface coil until water line (around 140mts more). From there, the Gyro Module. Exit point was in an existing pit on the seabed.
#HDD #Innovation & #experience #teamworkmakesthedreamwork Prime Horizontal #Americas