Prime Horizontal
careers

500th GyroTrack survey performed!

July 13, 2023 by  
Filed under Prime Blog

We are very proud to announce that Prime Horizontal’s expert team of GyroTrack survey engineers has reached the golden number of 500 #GyroTrack surveys.

This is a lot of pipelines, 130,900m to be precise, an average of 262m per survey. Our longest was 1360m and the most bends in one survey was 11 bends including two HDDs, all in one pipe. We have worked on every continent, in every weather condition surveying every kind of conceivable pipeline.

We look forward to the next ten years with the knowledge that our team of highly experienced engineers are ready to face all new upcoming Pipeline Mapping challenges.

Picture8 Picture9

Comments

Tell us what you're thinking...
and oh, if you want a pic to show with your comment, go get a gravatar!