Throwback Thursday: 2.6 km Indian HDD Intersect

June 15, 2023 by  
Filed under Prime Blog

Intersection with #ParaTrack2 Technology

Bhareli River Intersect

WhatsApp Image 2023-05-15 at 19.02.48 WhatsApp Image 2023-05-17 at 12.30.59 (2)

Tracking used: ParaTrack2
Location: Tezpur, Assam, India
Distance: 2630 m
Depth: -10.34 m
Entry Angle: 8 degree
Exit Angle: 8 degree
Ground: Sand with Clay.
Pipeline: 26” steel pipe
Technique: #Jetting assembly 6 ¾” – 9 7/8

Job Description: NRL is laying this pipeline in Northeast region of India. This pipeline will be used for oil distribution in Northeast India. It connects the Northeast to rest of India. HDD method is utilized to cross the Bhareli River to connect both ends of pipeline of this project. This project is a part of Paradip NRL Expansion project of Numaligarh Refinery Limited

NRP Patel completed another Intersection in Assam, India proving to be one of the most respected HDD companies in India.

Jupiter Cable System

June 6, 2023 by  
Filed under Prime Blog

Daet, Philippines- Jupiter Cable Syetem

Tracking used: #ParaTrack#GyroModule and #ACBeacon
Distance: 1,206 m
Depth: 31.56 m
Entry Angle: 17 degree
Exit Angle: 8 degree
Ground: Sand
Pipeline: Drill pipe 5”
Technique: #Jetting – Drill to sea

ParaTrack Gyro Module was utilised in combination with the AC Beacon which was used as a second tracking system from entry to the beach due to a limitation to lay down coil.
We drilled from land to sea 1,206m in sandy formation to install the fibreoptic wires.