River Crossing, Toulouse, France
November 22, 2022 by admin
Filed under Prime Blog
Ariege River Crossing
Tracking used: #ParaTrack2 & #GyroModule
Distance: 609.46 m
Depth: 26 m
Entry Angle: 12.1
Exit Angle: 17.5
Ground: Medium hard, sandstone
Pipeline: Steel 300mm
Technique: #MudMotor
Job Description: The job included 2 parallel bores, separated 5m away from each other. The 300 mm pipe was for gas. Depth below entry point was 26m, and we were drilling 64m deep below a steep hill in the middle of the bore.