Ariege River Crossing

Tracking used: #ParaTrack2 & #GyroModule

Distance: 609.46 m

Depth: 26 m

Entry Angle: 12.1

Exit Angle: 17.5

Ground: Medium hard, sandstone

Pipeline: Steel 300mm

Technique: #MudMotor

Job Description:  The job included 2 parallel bores, separated 5m away from each other. The 300 mm pipe was for gas. Depth below entry point was 26m, and we were drilling 64m deep below a steep hill in the middle of the bore.
Read more on LinkedIn.