World Record HDD drilling elevation
February 22, 2021 by Joseph
Filed under Prime Blog
ParaTrack Gyro Module sale in Australia!
February 22, 2021 by Joseph
Filed under Prime Blog
Prime #Australasia congratulates World Multi Link and Magitech on their recent purchase of a #ParaTrack #GyroModule to support ongoing operations in Taiwan and Thailand.
#First ParaTrack Gyro Module sale in South East Asia!
Contact your local Prime Horizontal representative to find out more.
#hdd #kudos #success #AustralianOperations
Looking for Field Service Engineers
February 22, 2021 by Joseph
Filed under Prime Blog
Field Service Engineers
Prime Horizontal is looking for Field Service Engineers to support the International Horizontal Directional Drilling and pipeline industry.
Click here for |
Job Description:
To provide Steering and guidance services to the International Pipeline industry. Involves international travel, ability to work in a team and individually under pressure, good communication and social skills.
Required:
- Ability to travel and work away from home.
- A university or college qualification in Engineering or related subject, incl. Maths.
- Hands on and Practical: likes working in the field outside as well as in the office.
- Excellent communicator.
- Professional, Motivated and Flexible.
- Clean Driver’s License.
The ideal candidate would have the following Skills and experience, but not limited to:
- Experience of working on a HDD rig or rig site.
- Running a HDD steering tool.
- CAD drawing experience.
- Total station: GPS or land surveying experience.
- Ability to speak English as well as any of the following: Dutch, French, German.
- Based in the Netherlands or willing to relocate to an office location in Holland.
Send your Resume + Cover letter to hr@primehorizontal.com
Prime Horizontal BV
Salland 3
1948 RE Beverwijk
The Netherlands
Phone: +31 251 271 790
First Gyro Module job in Australia
January 28, 2021 by Joseph
Filed under Prime Blog
PH successfully completes first Gyro Module job in Australia
Job title: Gas Pipeline Relocation
Tracking used: Gyro Module & ParaTrack 2
Location: Perth, WA, Australia
Distance: Crossing #1 = 250m, Crossing #2 = 320m
Depth: 8m below entry point ground level
Ground: Bassendean Sands and Ferricrete lenses
Pipeline: 6” Steel Pipe
Technique: Jetting
The job required the drilling of 2 crossings using jetting technique and steering with ParaTrack Gyro Module (PGM) which was a requirement from the project owner. Particular care and caution was taken as drilling was within 1m (at its closest point) of an existing gas pipeline, overhead power lines, railway tracks, as well as, other underground communication services lines posed a magnetic
challenge.
Not being affected by Magnetic interference being a specific advantage of the Gyro Module this was an ideal project for the Gyro Module & ParaTrack combination. ParaTrack monitored how close we were to an existing pipe.
To enable the use of Gyro Module to work with a smaller drill rig, we used our 4-3/4” OD modified Non-Magnetic tooling.
Due to a moderate risk of hydraulic fracturing near the exit points of each crossing annular pressure was monitored using a PGM compatible PWD (Pressure While Drilling) module. As an additional request due to a moderate risk annular pressure was had to be monitored due to a moderate risk of hydraulic fracturing near the exit points of each crossing, for that reason we used the PWD (Pressure While Drilling) module compatible with PGM. No hydraulic fracturing occurred thanks to the close monitoring of the pressure and drilling performance.
Both crossings were completed in 6 days and our client was satisfied with the results and was pleased to have Prime Horizontal as their partner in their initial experience using magnetic guidance systems and the Gyro Module.
Looking for a new teammate. Could you be the one?
October 8, 2020 by Joseph
Filed under Prime Blog
Field Service Engineers
Job Description:
- Travel to foreign locations as directed to perform guidance operations.
- Act as PH service representative (smart, clean business like and professional appearance).
- Research and collect all information necessary for the planning stage and design of the project on site (initial land survey topography, coil setup, probe & DHA setup, Fault-finding steering tools and client’s rig electrical system and Bore path design.
- Install equipment, test it to make sure it is functional and all safety requirements are met.
- Support the local teams of technicians/engineers and supervise operations at location.
- Operate steering tool system & determining optimum steering method to achieve borehole success.
- Conduct drilling operations according to project specifications and maintain equipment.
- Liaise with client regarding daily process of the project, potential steering issues & presentation to client of viable alternates for success.
- Daily contact with office regarding project progress, accurate and timely reporting to supervisor as issues develop on site.
- Timely submittal of all job related paperwork & computer files to the office.
- Preparation of final as-drilled report & CAD drawing and presentation to client of all paperwork including daily reports.
- Personally test all guidance equipment and take responsibility for all equipment being clean and in good working order prior to mobilization wherever possible.
- Keep up with changes in technology, sign up with for additional training and education courses when necessary.
Apply now:
If you are excited about the position and are eager to join our team, then don’t hesitate to send us your application (Resume + Cover letter) by Email to nico.dekker@primehorizontal.com
Remote Operations Support
October 1, 2020 by Joseph
Filed under Prime Blog
Remote Support Operations
Prime Horizontal: Leaders in #HDD have implemented Remote Support Operations for global projects.
Due to the current situation with Coronavirus and cancellation of overseas travel, Prime Horizontal’s offices have implemented the use of remote control tools for projects around the world. It has proven to be a good alternative, with excellent results, when no option to fly our senior engineers to projects is available.
Prime Horizontal has prepared a guideline outlining the tools, personnel, responsibilities and job setup recommendations for our remote support operations.
We Did It First in March.
The better alternative with excellent results! #teamworkmakesthedreamwork equals #success every time! Always there for you.
Block Leg Cutters
March 5, 2020 by Joseph
Filed under Prime Blog
Yet another nice set of Block Leg Cutters going out for a 54″ opening!
Day 2 at the UCT 2020: The ParaTrack Gyro Module on display
January 29, 2020 by Joseph
Filed under Prime Blog
Visit Prime Horizontal @ booth #205.
Have you had the chance to #visit with Christian yet?
Prime Horizontal extends range of downhole guidance tools
January 29, 2020 by Joseph
Filed under Prime Blog
Prime Horizontal continues to introduce innovations to the HDD market with its latest being the ParaTrack Gyro Module, a guidance tool for unrivaled accuracy.
With no concern of magnetic interference from nearby active utility lines, shore piles, ship traffic or any other transportation activity, drilling may be carried out confidently, regardless of surrounding conditions. The ParaTrack Gyro Module runs in conjunction with the ParaTrack Steering Tool, providing the ability to tie in with the entire ParaTrack System of tools and software.
The ParaTrack Gyro Module is a north-seeking gyro system that is especially effective for initial surface entry, while absolute position may then be verified via the ParaTrack-2 Guide Wire or Beacon Tracker, providing confidence that the bore is measured accurately along the bore path as well as relative to the planned exit location prior to punch out.
Ideal for intersects in areas with no surface coil. No need for calibration every two hours. And no issues with import and export into various countries as the Gyro can be hand-carried and transported easily in a rifle case.
Since its founding in 1998, Prime Horizontal has been a World Record holder for the longest HDD project, highly accurate pilot holes in freeze hole drilling applications, with more than 200 HDD intersects and more than 400 CBM bores successfully performed with the use of rotating magnet ranging system.
Another Success with the ParaTrack Gyro Module
October 28, 2019 by Joseph
Filed under Prime Blog
Another successful crossing completed with use of the recently released ParaTrack Gyro Module and great crew of Challenger Drilling. Challenger Drilling’s own Chase Lopez said “Fantastic service from Prime Horizontal, as always, and the use of the ParaTrack Gyro Module was spot on for this difficult crossing.” The project details were: 2600 feet with a 12 degree horizontal curve for 12 inch steel pipe crossing the Arkansas River near Tulsa Oklahoma.