Prime Horizontal #RemoteSteering Solution Japan

 IMG_4622

Location: Takahagi, Japan
Distance: 2 x 1050m pilot bores.
Depth: 30m
Horizontal Curve: 24°
Entry Angle: 15°
Exit Angle: 10°
Ground: Sandstone.
Pipeline: 5” Drill Pipe for telecom cable
Technique: #ParaTrack2 + AC Beacon (#Beacon Tracking System) + #MudMotor

Job Description:
Prime Horizontal continues to make the impossible possible by recently steering two #Parallel #Offshore #PilotBores successfully in Takahagi, Japan which is located in the Ibaraki Prefecture, found in the Kanto Region of Honshu, by means of remote steering.
#Steering services were provided by engineers based in Taiwan and Thailand while the job was coordinated from Prime Horizontal’s Australasian office in Queensland, Australia.
The job went extremely well and once again met the customers high standards and expectations despite challenges faced.
Congratulations to the #Australasian team on a job well done!

IMG_4753

IMG_4756

IMG_4634

Cable Crossing Flüelen-Dorni

June 9, 2022 by  
Filed under Prime Blog

Job title: Kabeltrasse Flüelen-Dorni  (Cable Crossing Flüelen-Dorni)

View from the ground looking into the tunnel LFB-set-up Mountain scenery Panorama_Alte_Axenstrasse_view Plan view

Tracking used: #ParaTrack2 Guidance and #LargeFieldBeacon, no surface coil.

Location: Flüelen, Alte Axenstrasse, Uri, Switzerland

Distance: 192 m

Horizontal Curve: 7 deg left turn

Entry Angle: 7 deg

Exit Angle: 7 deg

Ground: Rock

Pipeline: 2 x 140 mm PE, 2 x 180 mm PE

Technique: Prime Horizontal 3 1/8” #MudMotor

What the end use would be for: Electric cables

 

Job Description: An #extraordinary project regarding set up, as it was not possible to use coil, the Large Field Beacon was the only source of an electromagnetic field.

Alte Axenstrasse (Old Axen Road) is the name of an engineering masterpiece in the canton of Uri in Central Switzerland. Running along steep cliffs on the east side of the Lake Lucerne, the road for horse-drawn carriages was built in 1865 after 4 years of construction.

The construction of the Axenstrasse was a technical challenge because of the steep terrain. It runs through many rock fall galleries and tunnels along its route. It was named the Axenstrasse because the road is located along the Axen Mountain.

The scenic old road is 1.0 km (0.62 miles) long windings its way between water and rock. It contains passages blasted out of the rock, rock galleries and a tunnel wall with multiple openings, which offers a view of the lake, Flüelen and the Reuss Valley as well as the vast Alpine and forest areas. Ice and snow can be on the way.

#HDD #success #teamworkmakesthedreamwork

 

 

Countdown to the Big Event Down Under!

May 25, 2022 by  
Filed under Prime Blog

AUSTT_NODIG_2022_social-media-postPrime Horizontal is getting geared up for the No-Dig Down Under #Event that’s happening in three weeks time. Come and have a chat with Gary and Tina at booth #6!

To register, click here

100° Right Horizontal curve

May 18, 2022 by  
Filed under Prime Blog

Kudos on a #successful job completed with #ParaTrack#GyroModule together with a #MudMotor assembly for the reorganization of 30kV cables in Copenhagen, Denmark.
Tracking used: 100m surface coil at entry side, #LFB to check position before we reached exit side.
Distance: 630.11m
Depth: 16m under seabed, 24m under sea level
Horizontal Curve: 100deg Right
Entry Angle: 12deg
Exit Angle: 19deg
Ground: Backfilled ground, clay and limestone
Pipeline: 315mm HDPE
Technique: 4 ¾” Mud Motor, 6 1/2” TCI Bit
Job Description:
Challenging project crossing a wide harbor to lay a 30kV line between a power plant and a wastewater treatment plant.
Started in the north side, close to the power plant.
Drilling straight parallel to the main road (100m surface coil). 80m after reaching the water edge, started a right turn (100 deg) until the end. Punching out just 20m after reaching exit side.
Limestone started 20m below sea level. On the way down we had some spots with bad ground (stones or gravel). On the way up, last 40-50m ground was extremely soft, in spite of this we managed to punch out successfully!

281570982_5000017766784630_3178941785207537407_n281682911_5000016473451426_3293895859962651073_n

FieldReport_020222MG_page-0001

ParaTrack Gyro Module: The most flexible accurate tool!

May 11, 2022 by  
Filed under Prime Blog

The #ParaTrack #GyroModule isn’t just your standard #HDD gyro, it’s an investment in a complete guidance toolbox that provides flexibility no matter where your #trenchless projects take you. #Accurate

Did you know?

March 21, 2022 by  
Filed under Prime Blog

Did you know?

…that Prime Horizontal Inc supports North, Central, & South America from bases in Texas, Canada, Mexico, & Brazil?
Do get in touch with Dillon Wilson: Prime Horizontal’s US Sales Representative.
We’re just a phone call away.
#Primehorizontal

Sales_US_rep

 

 

 

 

 

 

 

 

 

 

Headed to Sweden

February 9, 2022 by  
Filed under Prime Blog

1_20220118_132135Impressive! Brand New: Spick and span 24’’ Split Bit Hole Opener left the Prime Horizontal #Europe warehouse for the Swedish market.
• 24″ x 12″ PH 5 Cone Split Bit Hole Opener, with 4 1/2″ IF BxB Connections. Seen here dressed in 16″ Dual Seal IADC 537 Cutters with #Double Sided Leg Protection.
This is with longer than standard gussets and fully #HardMetaled centralizer bars, and a set of front and rear facing jets.
Contact your local Prime Horizontal to get your #HDD projects equipped with the #GreenFleet!

All dressed up!

January 26, 2022 by  
Filed under Prime Blog

Screen Shot 2022-01-18 at 16.22.46
Yet another #Viper sale.Screen-Shot-2022-01-25-at-16.54.30
Customised Viper body fully dressed with 14’’ #TCI cutters as per customers request. Sent out from Prime Horizontal#Europe. Your proud #Global suppliers of Viper RockReamer™ Now internationally available!
For more info, click here

 

 

Another Viper delivery

January 18, 2022 by  
Filed under Prime Blog

Screen Shot 2022-01-18 at 16.22.46

Proud #GlobalSuppliers of #ViperRockReamer; Prime Horizontal sent out yet another delivery of Viper cutters and arms.
This time out of the #Europe warehouse. Well done!
Click here: for more information on the Viper RockReamers
Follow us on LinkedIn.

Viper_cutters

PH Aus is looking for Field Service Engineers

October 27, 2021 by  
Filed under Prime Blog

Field Service Engineer
EN_Field-Service_EngineerAUS-1
About the business and the role

  • Prime Horizontal is a leading service and guidance company in the utility pipeline sector. We operate on a global basis offering a wide range of guidance engineer services, specialising in Horizontal Directional Drilling in Non-Oilfield applications. We have established a culture of innovation where our employees really make a difference.

To expand our team of Guidance Engineers we are looking for

Field Service Engineers

Employment status:

  • Full Time
  • Ability to travel
  • Salary dependent upon experience

Job tasks and responsibilities

  • Travel to and from Australian base as well as foreign locations to perform guidance operations (US, Canada, Europe, Asia and South America) as directed.
  • Office based role, when not in the field, as directed by the local manager.
  • Act as PH service representative (smart, clean business like and professional appearance).
  • Research and collect all information necessary for the planning stage and design of the project on site (initial land survey topography, coil setup, steering equipment setup and bore path design).
  • Support the local teams of technicians/engineers and supervise operations at location.
  • Operate steering tool system & determining optimum steering method to achieve borehole success.
  • Liaise with client regarding daily process of the project, potential steering issues & presentation to client of viable alternates for success.
  • Daily contact with office regarding project progress, accurate and timely reporting to supervisor as issues develop on site.
  • Timely submittal of all job related paperwork & computer files to the office.
  • Preparation of final as-drilled report & CAD drawing and presentation to client of all paperwork including daily reports.
  • Personally test all guidance equipment and take responsibility for all equipment being clean and in good working order prior to mobilization wherever possible.
  • Keep up with changes in technology, sign up for additional training and education courses when necessary.
  • Work on site, in- and outdoor in all weathers and conditions.

Skills and experience

The successful applicants will have a university degree in relevant discipline or equivalent experience in the field. Strong mathematics backgrounds integrated with excellent computer and communication skills, and demonstrating a high level of professional integrity. Experience with AUTOCAD, Land Surveying, Steering tool software (ParaTrack/Tensor/Gyro) and foreign languages (preferable but not essential).

Job benefits and perks

Prime Horizontal offers a competitive benefits package and personal development opportunities.

Please send your application with a cover letter and CV/resume to: Nico Dekker (HR Manager) via mail: nico.dekker@primehorizontal.com We are planning the first interviews in October/November 2021

Visit our website; www.primehorizontal.com

 

« Previous PageNext Page »