Prime Horizontal
careers

Bringing Renewable Energy to Breydin, Germany

August 2, 2022 by  
Filed under Prime Blog

Kudos on yet another job well done #PrimeHorizontal Europe!

1van

A different but not unusual project regarding set up as it was through 321 meters of private land that was not accessible. It was a job for a 6” pilot shoe and 3” assembly with soft soil present. The first 2m at entry side was sand and gravel followed by clay and soil. Exit side was mild dense soft soil and some big boulders that were visible when digging the exit pit.

Seeing as it was not possible to lay coil, the Large Field Beacon was utilized as a source of an electromagnetic field, making it possible to drill an HDD Crossing for electrical cables for wind energy.Tracking used: #ParaTrack2, Surface Coil and Large Field Beacon #LFB

jet_shoe

Distance: 411.5m
Depth: 13m
Entry Angle: 15degree
Exit Angle: 14degree
Ground: Soft Soil
Pipeline: 6’’ HDPE
Technique: #JettingLFB

#Teamworkmakesthedreamwork #RenewableEnergy

 