Prime Horizontal
careers

Welver Railway Crossing

August 30, 2022 by  
Filed under Prime Blog

1Bahnhof_Welver 2IMG_20220629_104825

Prime Horizontal: Innovation & Experience
Welver Railway Crossing
Tracking used: #ParaTrack-2 with surface coil
Location: Welver, Germany.
Distance: 92.50m X 2
Depth: 8m
Entry Angle: 15 degree
Exit Angle: 15 degree
Ground: Soft Soil
Pipeline: 6” HDPE
Technique: Jetting- Jet shoe
Another project demonstrating the flexibility and accuracy of the ParaTrack-2 system as it entailed drilling parallel pilot holes to lay electrical cables under a busy railway track to harness wind energy.
This required #accuracy in all aspects, including length, depth, left & right angles on these parallel pilot holes with 2m offset from one another.
The pilot holes were completed in a shift and the 6 inch HDPE was pulled in under an hour! #Quick job with high accuracy. ParaTrack-2 utilised effectively & accurately underneath a railway.

Hadelner Canal HDD Crossing

August 17, 2022 by  
Filed under Prime Blog

Transporting #wind gained electricity under the Elbe-Weser Waterway
800px-Odisheim_02

 

 

 

 

Despite the interference due to frequent flow of traffic of boats throughout the whole crossing, the team was able to successfully perform a HDD crossing under the Elbe-Weser Waterway by means of #ParaTrack2 in combination with the Surface Coil.
A 20-ton Ditch Witch rig was set up parallel to the road and barley field. 50m of surface coil was laid down at entry and 60m at exit side. The formation was soft soil and clay, so a 3” Jetting assembly and a 6” jetting shoe was utilized to drill at depths of 6 meters under the canal.
The objective was to pull wind #energy electric cables underneath the waterway for transport of wind gained electricity. The entire process was completed in just 2 days, well done to the team involved!

20220622_13255920220622_13245520220622_132434

Tracking used: ParaTrack2 with Surface Coil
Location: Norderende, Germany.
Distance: 164.50m
Depth: 11.20m
Entry Angle: 15 degree
Exit Angle: 15 degree
Ground: Soft Soil
Pipeline: 100mm HDPE
Technique: #Jetting
#teamworkmakesdreamwork Prime Horizontal

One more MudVis out the door!

August 4, 2022 by  
Filed under Prime Blog

#Congratulations Prime Horizontal Europe on yet another #MudVis unit on its way to a job site.
MudVis: the automated Mud Viscosity and Specific Gravity measuring and logging system. Designed specifically for the HDD industry the MudVis samples your stock; or mixing tank bentonite at regular preset intervals. The viscosity and specific gravity values are logged in the processing unit, displayed on a sunlight viewable LCD screen, on WiFi enabled laptops, smartphones, and tablets for easy viewing.
MudVis
#Real-time #automated Viscosity measurements during the mixing process
• Easy tracking of mud weight throughout the drilling & reaming process
• Generates mud mixing data for reports to assist Mud Engineer
• Data download via WiFi for #logging, reporting and analysis purposes
• Monitoring is accessible via WiFi from around the drill site from laptops, smartphones and tablets
• Low maintenance, self-calibrating & cleaning system
• Exterior mounted alarm system
• Enables quick reactions to changing soil conditions
• Compact unit enables #flexible installation on the mud tank
Find out more at https://primehorizontal.com/mudvis/

 

Bringing Renewable Energy to Breydin, Germany

August 2, 2022 by  
Filed under Prime Blog

Kudos on yet another job well done #PrimeHorizontal Europe!

1van

A different but not unusual project regarding set up as it was through 321 meters of private land that was not accessible. It was a job for a 6” pilot shoe and 3” assembly with soft soil present. The first 2m at entry side was sand and gravel followed by clay and soil. Exit side was mild dense soft soil and some big boulders that were visible when digging the exit pit.

Seeing as it was not possible to lay coil, the Large Field Beacon was utilized as a source of an electromagnetic field, making it possible to drill an HDD Crossing for electrical cables for wind energy.Tracking used: #ParaTrack2, Surface Coil and Large Field Beacon #LFB

jet_shoe

Distance: 411.5m
Depth: 13m
Entry Angle: 15degree
Exit Angle: 14degree
Ground: Soft Soil
Pipeline: 6’’ HDPE
Technique: #JettingLFB

#Teamworkmakesthedreamwork #RenewableEnergy