Tracking used: #ParaTrack2 & #ParaTrackGyroModule
Location: Brussels (Belgium)
Distance: 468.13m
Depth: 13m
Horizontal Curve: 40° (Right)
Entry Angle: 16°
Exit Angle: 16°
Ground: Sandstone
Pipeline: 3 x 200mm and 1 x 110mm HDPE
Technique: #RoadCrossing
Job Description: Road crossing along Hector Henneaulaan street in Machelen, a municipality of Brussels. Due to its heavy traffic, Horizontal Directional Drilling #HDD was utilised to install new power cables along this street via means of Road Crossing technique. The ParaTrack Gyro Module was accurately used for a length of 468.13m at a depth of 13m. #teamworkmakesthedreamworkhttps://www.linkedin.com/feed/update/urn:li:activity:6958063118744784896
Tags:
Comments
Tell us what you're thinking... and oh, if you want a pic to show with your comment, go get a gravatar!
Prime Horizontal contributes a percentage to Doctors without Borders. We are proud to place their contact information on our site, should you wish to know more about them or wish to contribute yourselves, click on their logo.
Contact Us
If you would like to speak to
someone in person, please call one
of the following offices:
Head Office - Europe, China, Middle East, India
Prime Horizontal BV
Salland 3
1948 RE Beverwijk
The Netherlands
Ph: +31 251 271 790
E:
office@primehorizontal.com United States, Canada, Mexico
Prime Horizontal Inc
7710 Harms Road
Houston, TX 77041
U.S.A.
Ph: +1 346 998 1180
E: officeusa@primehorizontal.com
Australia and Southeast Asia
Prime Horizontal Australia Pty Ltd
Unit 2/220
New Cleveland Road
Tingalpa Qld 4173
Australia
Ph: +61 7 3821 3684
E: officeau@primehorizontal.com
Comments
Tell us what you're thinking...
and oh, if you want a pic to show with your comment, go get a gravatar!