Pilot drilling & pipe pulling under the canals of Bangkok
Tracking used: ParaTrack2
Location: Bangkok, Thailand
Measured Distance: Pipe 1: 375 m Pipe 2: 325 m
Depths: 30 m & 28 m
Horizontal Curve: 12.2 degrees & 15.6 degrees
Entry Angle: 18 degree
Exit Angle: 18 degree
Ground: Clay
Pipeline: HDPE 180mm x 30 (bundle)
Technique: #Jetting – Bridge & #Canal #crossing
End use would be for Electrical cables
Job Description:
Drilling two pilot holes under the piling of a busy bridge of the bustling city of Bangkok with its deep canals without disrupting the daily goings on up above ground can pose quite a challenge.
To deal with the high #interference caused by communication cables present underground #steering was done with the #ParaTrack2. Two bundles of 30 HDPE pipes, measuring 180mm each were successfully pulled through under the existing underground utilities. Well done to the team involved and to Prime Horizontal #Australasia!
Comments
Tell us what you're thinking...
and oh, if you want a pic to show with your comment, go get a gravatar!