Throwback: Gyro Module job in Plock, Poland end of 2020

February 24, 2021 by  
Filed under Prime Blog

#PrimeHorizontal #Europe

Throwback Thursday #successtory to end 2020:

Gyro Module job in Plock, Poland

Tracking used: #GyroModule, #ParaTrack2 and Pressure Whilst Drilling (#PWD)

Plock_1

Distance: 698m (2,290’)

Water distance: 534m (1,750’)

True Vertical Depth: 41 m (134’)

Cover under riverbed: 27 m (88’)

Entry coil: 43m (141’)

Exit coil: 110m (360’)

Formation: Clay

BHA: Motor Assembly (Mud motor 6 ¾” + 12 ¼” bit)

Plock_2

This complex project started with a 2 degree bend setting on a 6 ¾” mud motor, and a 12 ¼” bit. The ground was variable initially which caused the usual issues, eventually as we drilled along the profile the adjustable bent housing allowed us to change the motor bend, to 2.24 degrees, on the job site to be more aggressive.

The predominant formation was clay.

The project was designed to cross under the Largest Polish river whilst utilizing the pressure whilst drilling throughout the complete crossing for monitoring returns.

Crossing length 698m. 6m long drill pipes 5″ and on a 600KN Rig.

The Pilot Hole was #successfullycompleted with great teamwork and experience, which enabled us to complete a job with a #great result.

#teamworkmakesthedreamwork #hdd

 

N-Net Japan PGM project

February 23, 2021 by  
Filed under Prime Blog

#Kudos to #PrimeHorizontal #Australasia
N-Net Japan PGM project: Observation Network for Earthquakes & Tsunamis

Distance: 773m
Depth: 82m
Entry/ Exit angle: 20°/ 10°
Horizontal curve: 23.4°
Product Pipe Installed: Drill pipe 5”
Tracking used: #ParaTrack #GyroModule, surface coil & #ACBeacon (BTS)
Technique: 6 ¾” Mud motor (Outfall)

N-Net Japan PGM pic3

We were required to drill the pilot bore from the top of the mountain through a 2m steel circular intermediate shaft, 48m below Entry elevation located at shoreline 132m away from the entry point, the intermediate shaft was required to control the mud pressure whilst drilling below the seabed. After running steel casing from entry to intermediate shaft, Pilot drilling continued drilling 641m out to sea turning 23.4° before punching out on the seabed with a 10° exit angle.

N-Net Japan PGM pic2

A 60m surface coil in combination with the #BTS (AC Beacon) was used as secondary tracking between the entry point and the intermediate shaft to confirm the elevation before continuing through the shaft to exit. The ParaTrack Gyro Module was utilized from entry until punch out on the sea Floor, exit position was verified by Divers and the DHA removed 16m below sea level.
N-Net Japan PGM pic1
Contact your local Prime Horizontal representative.
#success
#teamworkmakesthedreamwork

 

 

World Record HDD drilling elevation

February 22, 2021 by  
Filed under Prime Blog

#Kudos to Schenk and #PrimeHorizontal on setting a #WorldRecord HDD drilling elevation of 690m!
image-2-Recovered

Job title: Romsdalsgondolen
Tracking used: #ParaTrack2 , #GyroModule, Large Field Beacon (#LFB)
Location: Åndalsnes, Norway
Distance: 1340m
Depth: 690m
Horizontal Curve: 1300m
Entry Angle: 90°
Exit Angle: 140°
Ground formation: Granite
Pipeline: Steel pipe, for gas, water and electricity.
Technique: Gyro Module combined with Mud motor and At Bit Inclination Assembly (#ABIA).

Compliments to the vision of Beni Schenk and the guidance team from Prime Horizontal to successfully complete this project.

#teamworkmakesthedreamwork #primehorizontal #schenk

ParaTrack Gyro Module sale in Australia!

February 22, 2021 by  
Filed under Prime Blog

Prime #Australasia congratulates World Multi Link and Magitech on their recent purchase of a #ParaTrack #GyroModule to support ongoing operations in Taiwan and Thailand.
#First ParaTrack Gyro Module sale in South East Asia!
Contact your local Prime Horizontal representative to find out more.

pgm_first-sale_clipped

 

 

 

 

 

 

 

 


#hdd #kudos #success #AustralianOperations

Looking for Field Service Engineers

February 22, 2021 by  
Filed under Prime Blog

Field Service Engineers

Prime Horizontal is looking for Field Service Engineers to support the International Horizontal Directional Drilling and pipeline industry.

Click here for EN DE FR

Job Description:

To provide Steering and guidance services to the International Pipeline industry. Involves international travel, ability to work in a team and individually under pressure, good communication and social skills.

Required:

  • Ability to travel and work away from home.
  • A university or college qualification in Engineering or related subject, incl. Maths.
  • Hands on and Practical: likes working in the field outside as well as in the office.
  • Excellent communicator.
  • Professional, Motivated and Flexible.
  • Clean Driver’s License.

The ideal candidate would have the following Skills and experience, but not limited to:

  • Experience of working on a HDD rig or rig site.
  • Running a HDD steering tool.
  • CAD drawing experience.
  • Total station: GPS or land surveying experience.
  • Ability to speak English as well as any of the following: Dutch, French, German.
  • Based in the Netherlands or willing to relocate to an office location in Holland.

Send your Resume + Cover letter to hr@primehorizontal.com
Prime Horizontal BV
Salland 3
1948 RE Beverwijk
The Netherlands
Phone: +31 251 271 790