Pressure While Drilling (PWD) Sub

The PWD Sub

In conjunction with a Pressure Module and a Pressure While Drilling (PWD) Orienting Sub, the ParaTrack-2 system tool is used to measure downhole pressure. It gives real-time measurements of mud pressure both inside the drill pipe and in the annulus just behind the drill bit. Pressure measurements are taken behind the bit when jetting. When using a mud motor the pressure is measured directly behind the mud motor.

 

The Paratrack-2 tool must be the PWD enhanced version to allow the connection of the Pressure Module as shown.

Specifications
Length: 600 mm (23.6″)
Drillpipe annulus gauge: 350 bar full scale
Pilot hole annulus gauge: 35 bar full scale

Pressure While Drilling (PWD) / orienting sub

The pressure module has a grease-filled access port in its side for measurement of the pipe pressure and another grease-filled access port at the bottom which allows transport of pressure from the specialized Pressure While Drilling (PWD) / orienting sub as shown in Figure 2. The PWD sub uses a grease-filled access port to transport pressure measured from the outside of the PWD sub to the Pressure Module. The Pressure Module then sends the pressure data up the wire line to the interface box and computer located at the top of the hole.

The Pressure While Drilling (PWD) Orienting Sub showing the attached Pressure Module
The Pressure While Drilling (PWD) Orienting Sub showing the attached Pressure Module

The pressure data is monitored and stored by the standard RivCross software used with the Paratrack-2 system. The pressure can be viewed in real time. It is also stored for later use. The software allows easy graphical representations of pressure variations with time, an example of which is shown in Figure 3. Alarms can also be set in the software and will trigger if pressure limits are exceeded during drilling.

Because it is capable of giving a rapid indication of an increase in downhole pressure, the measurement of pressure while drilling is an effective technique to reduce the risk of bentonite (drilling mud) breakout during the drilling process. It can also help ensure that a drilled hole is kept clean and free of blockages, thus reducing operational risks.

An example of a post-job PWD drilling chart.
An example of a post-job PWD drilling chart.

For more information please

MudVisAd_Ad_widget
sidebar-3

Doctors Without Borders

Prime Horizontal contributes a percentage to Doctors without Borders. We are proud to place their contact information on our site, should you wish to know more about them or wish to contribute yourselves, click on their logo.

Contact Us

If you would like to speak to
someone in person, please call one
of the following offices:

Head Office - Europe, China, Middle East, India
Prime Horizontal BV
Salland 3
1948 RE Beverwijk
The Netherlands
Ph: +31 251 271 790
E: [email protected]

United States, Canada, Mexico
Prime Horizontal Inc
7710 Harms Road
Houston, TX 77041
U.S.A.
Ph: +1 346 998 1180
E: [email protected]

Australia and Southeast Asia
Prime Horizontal Australia Pty Ltd
Unit 2/220 New Cleveland Road
Tingalpa Qld 4173
Australia
Ph: +61 7 3821 3684
E: [email protected]