Precision in Action: Shortest HDD Intersect Yet

Successful HDD Intersect in France – Our Shortest Intersect Thus Far!

Rainbow ending at the job site
Rainbow ending at the job site
Tracking used:Intersect
Location:Castelsarrasin (France)
Distance:196.38m
Depth:16m
Entry Angle:15deg
Exit Angle:15deg
Ground:Clay
Pipeline:250mm HDPE sleeve. Product pipe 160mm HDPE
Technique:Jetting
Was it an Intersect/CBM/River crossing:Intersect under railway tracks
What would the end use be for?:Gas

An accurate intersect was required to cross two railway tracks, due to ground conditions made an intersect the best option. Casings were installed on both sides to avoid a gravel layer, with an entry casing of 30 meters and an exit casing of 24 meters.
The design allowed only a 35 meters of straight alignment window beneath the railway tracks to achieve the intersect.
The operation proceeded smoothly, resulting in a successful intersect.
At 196.38m long, probably the shortest intersect to date!

 

#PrimeHorizontal #TheOriginalIntersectCompany #HDD #Innovation #InnovationAndExperience #Catalana de Perforacions #Terega