Dual Crossings, One Project

Delivering Gas Infrastructure Beneath a River and a Railway

Two HDD Crossings in Pojuca, Brazil

Prime Horizontal is proud to support critical gas infrastructure with two successful HDD crossings in Pojuca, Bahia, Brazil – executed with precision using ParaTrack2 guidance.

 

1) Rio Jacuipe River Crossing
    • 398 m at 14–15 m depth
    • S-type curve (716 m & 743 m radii)
    • 16” steel pipe installed via jetting through sandy sediments
    • Completed parallel to a main road

 

2) Ferrovia Railroad Crossing
    • 421 m at 16.13 m depth
    • Combined radius 621 m (Hz 700 m / Vert 1350 m)
    • 16” steel pipe installed using jetting & mud motor, with casing run
    • Ground conditions: soft sand, hard clay & rock beneath the railroad

 

The teams worked through challenging ground conditions to deliver a smooth execution — ensuring safe and efficient gas transport beneath both a river and a railway.
At Prime Horizontal, we combine innovation, accuracy, and trenchless expertise to overcome complexity and keep infrastructure moving forward.

 