Guayuriba River HDD
February 22, 2024 by admin
Filed under Prime Blog
HDD Río Guayuriba, Colombia
Gas pipeline: Apiay – Usme
Status: Drilling, installation, “TIE IN” connection works, commissioning, civil works completed.
Tubing: 6″ Steel
Maximum depth: 29 meters
Length: 450 meters
Guidance Tool: ParaTrack 2
Guidance Services & Tooling provided by Prime Horizontal on this project: Mud Motor, TriCone Bits, NonMags, Spiders, Crossover Subs & Guidance Engineer.
Drill Pipe: 5 1/2″ FH
Mud Motor: 6 3/4″ 9/10 Lobe Stage 4.0
Fluid Service: Mix Drill
Soil: Alluvial, black mudstones, slightly calcareous micaceous, pebbles.
Obstacles: Uneven terrain for entrances, constant rainfall, logistical challenges for equipment and machinery.
Client: International Gas Carrier.
Kudos on completing of the construction and installation of pipelines for the gas network by Horizontal Directional Drilling under the Guayuriba River of the Apiay-Usme gas pipeline.
#Congratulations #PrimeHorizontal #TheOriginalIntersectCompany #25Years #HDDInnovationandExperience #ParaTrack #Gas
IRO Oldenburg Germany
February 7, 2024 by admin
Filed under Prime Blog
Oldenburg, Germany, the Institute for Pipeline Construction (IRO)
Looking forward to seeing you there at the IRO in Oldenburg these two days.
Wij kijken ernaar uit om u te zien bij de IRO in Oldenburg aankomende dagen.
Ich freue mich, Sie auf der IRO zu sehen.
#PrimeHorizontal #TheOriginalIntersectCompany #25Years #HDDInnovationandExperience #ParaTrack #IRO #oldenburgerrohrleitungsforum #gyro