PRIME HORIZONTAL INC Prime Horizontal is a leading service company in the horizontal drilling sector. We operate on a global basis offering a wide range of services, ranging from down-hole tooling to specialist...
Longest HDD Intersect in India
January 12, 2023 by admin
Filed under Prime Blog
4th longest crossing in the world Tracking used: #ParaTrack2 Location: Assam, India Distance: 4088 m Depth: 45.90 m Entry Angle: 12 ° Exit Angle: 10 ° Ground: Sand with Clay Pipeline: 6” steel pipe Technique: #Jetting...
Season’s Greetings!
December 19, 2022 by admin
Filed under Prime Blog
Wishing you Happy Holiday’s & a Joyous New Year! #HDD #Innovation & #experience Read More →
River Crossing, Toulouse, France
November 22, 2022 by admin
Filed under Prime Blog
Ariege River Crossing Tracking used: #ParaTrack2 & #GyroModule Distance: 609.46 m Depth: 26 m Entry Angle: 12.1 Exit Angle: 17.5 Ground: Medium hard, sandstone Pipeline: Steel 300mm Technique: #MudMotor Job...
One of the largest tidal stream energy in the world
November 9, 2022 by admin
Filed under Prime Blog
The Morlais project will install turbines on 35 sq km (13 sq miles) of seabed, generating up to 240MW of electricity from the power of the tides in the Irish Sea. It would make it one of the largest...
HDD innovation and experience
November 3, 2022 by admin
Filed under Prime Blog
Did you know Prime Horizontal provides #ABIA (At Bit Inclination Assembly), #ParaTrackGyroModule, guidance, downhole tooling, & #ProData rig recording system? Drop us an email or give us a call...
Looking for new teammates in Brisbane, Australia.
October 19, 2022 by admin
Filed under Prime Blog
Could you be one of our new teammates? Looking for Guidance Engineers to join the Prime Horizontal Australian team based in Tingalpa, Brisbane QLD. Click here! About the business and the role Prime...
Prime Horizontal is happy to provide the ABIA!
October 12, 2022 by admin
Filed under Prime Blog
Do read the article on the #ABIA (At Bit Inclination Assembly). Thank you for the mention Trenchless Technology Magazine, Prime Horizontal is happy to be of service! Click on the thumbnails to get to...
Klostermansfeld Railway Crossing
September 22, 2022 by admin
Filed under Prime Blog
Railway Crossing in south of Klostermansfeld, Germany. Tracking used: Surface coil Distance: 104.75m Depth: 6m Horizontal Curve: Straight crossing Entry Angle: 13deg Exit Angle: 14deg Ground: Stiff...
Edmonton Legislature Building- Power Upgrade
September 7, 2022 by Joseph
Filed under Prime Blog
Short ones are the tricky ones. Tracking used: #ParaTrack2 Location: Downtown Edmonton, Alberta, Canada Distance: 250m (820 ft) Depth: 20m (66 ft) Horizontal Curve: 19.23deg Entry...