Klostermansfeld Railway Crossing

September 22, 2022 by  
Filed under Prime Blog

Railway Crossing in south of Klostermansfeld, Germany. Tracking used: Surface coil Distance: 104.75m Depth: 6m Horizontal Curve: Straight crossing Entry Angle: 13deg Exit Angle: 14deg Ground: Stiff... 

Read More>>

Edmonton Legislature Building- Power Upgrade

September 7, 2022 by  
Filed under Prime Blog

Short ones are the tricky ones.   Tracking used: #ParaTrack2   Location: Downtown Edmonton, Alberta, Canada   Distance: 250m (820 ft)   Depth: 20m (66 ft)   Horizontal Curve: 19.23deg   Entry... 

Read More>>

Fuldi River Crossing

September 5, 2022 by  
Filed under Prime Blog

Prime Horizontal #InnovationAndExperienceTracking used: #ParaTrack1 (Tensor) Supported by Prime Horizontal’s Indian based engineer Location: Narayanganj, Bangladesh Distance: 600.11 m Depth: 28 m Entry... 

Read More>>

Parallel Bore Under The World’s Busiest Canal

September 1, 2022 by  
Filed under Prime Blog

Tracking used: Surface Coil + AC Beacon for bore #1, Underground Coil for bore #2 Location: Rendsburg, Germany Distance: bore #1: 378.49m, bore #2: 381.58m Depth: 24m Entry Angle: 10deg Exit Angle:... 

Read More>>

Welver Railway Crossing

August 30, 2022 by  
Filed under Prime Blog

Prime Horizontal: Innovation & Experience Welver Railway Crossing Tracking used: #ParaTrack-2 with surface coil Location: Welver, Germany. Distance: 92.50m X 2 Depth: 8m Entry Angle: 15 degree Exit... 

Read More>>

Hadelner Canal HDD Crossing

August 17, 2022 by  
Filed under Prime Blog

Transporting #wind gained electricity under the Elbe-Weser Waterway         Despite the interference due to frequent flow of traffic of boats throughout the whole crossing, the team... 

Read More>>

One more MudVis out the door!

August 4, 2022 by  
Filed under Prime Blog

#Congratulations Prime Horizontal Europe on yet another #MudVis unit on its way to a job site. MudVis: the automated Mud Viscosity and Specific Gravity measuring and logging system. Designed specifically... 

Read More>>

Bringing Renewable Energy to Breydin, Germany

August 2, 2022 by  
Filed under Prime Blog

Kudos on yet another job well done #PrimeHorizontal Europe! A different but not unusual project regarding set up as it was through 321 meters of private land that was not accessible. It was a job for... 

Read More>>

Machelen Road Crossing

July 27, 2022 by  
Filed under Prime Blog

Tracking used: #ParaTrack2 & #ParaTrackGyroModule Location: Brussels (Belgium) Distance: 468.13m Depth: 13m Horizontal Curve: 40° (Right) Entry Angle: 16° Exit Angle: 16° Ground: Sandstone Pipeline:... 

Read More>>

Canal crossing in Thailand

July 20, 2022 by  
Filed under Prime Blog

Pilot drilling & pipe pulling under the canals of Bangkok Tracking used: ParaTrack2 Location: Bangkok, Thailand Measured Distance: Pipe 1: 375 m Pipe 2: 325 m Depths: 30 m & 28 m Horizontal... 

Read More>>